论文标题
用电子束对SIW-ECAL技术原型梁测试的分析
Analysis of SiW-ECAL technological prototype beam test with electron beam
论文作者
论文摘要
SIW-ECAL技术原型的光束测试是在2019年6月至7月在德国汉堡的Desy测试梁设施中使用电子束进行的。在梁测试中,有两个主要程序:MIP程序(无钨)和淋浴程序(带有钨)。 MIP程序的目的是能量校准,基座均匀性/稳定性评估,TDC操作测试和Retrigger验证。另一方面,淋浴计划旨在通过光束能量测量来评估能量分辨率。此外,还对FEV13进行了几项操作测试,例如单个阈值控制和自动增益模式。本文介绍了Siw-Ecal技术原型的性能,主要关注FEV13-JP版本。
The beam test for the SiW-ECAL technological prototype was conducted using electron beam in June-July 2019 at DESY test beam facility in Hamburg, Germany. In the beam test, there were two main programs: MIP program (without tungsten) and shower program (with tungsten). The purposes of the MIP program are energy calibration, pedestal uniformity/stability assessment, TDC operation test, and retrigger verification. On the other hand, the shower program aims to evaluate energy resolution through beam energy measurement. In addition, several operation tests with FEV13 were also conducted such as individual threshold control and auto gain mode. This article presents the performance of the technological prototype of SiW-ECAL, mainly focusing on the version of FEV13-Jp.