论文标题
CMS RPC数据在LHC RUN-2和长时间关闭期间的活动2
CMS RPC data taking during the LHC Run-2 and activities during Long Shutdown 2
论文作者
论文摘要
CMS实验在$ \ sqrt {s} $ = 13 tev的LHC的运行2数据时,在$ \ sqrt {s} $ = 13 tev中收集了大约150 fb $^{ - 1} $。 CMS RPC系统提供了冗余信息,用于鲁棒的启发,重建和识别。为了确保稳定的数据获取,CMS RPC协作进行了检测器操作,校准和性能研究。 Run-2结束后,它开始了第二个LHC长时间关闭期(LS2),这是维护和准备下一个数据花期(RUN-3)的重要机会(RUN-3)和安装服务,以准备阶段II升级。活动包括维护电力,天然气和在线系统。在本演讲中,总结了CMS RPC系统在RUN-2期间的总体性能以及为将来的数据花期准备准备的所有活动。
The CMS experiment collected around 150 fb$^{-1}$ of proton-proton collision data at $\sqrt{s}$ = 13 TeV during the Run-2 data taking period of LHC. The CMS RPC system provided redundant information for robust muon triggering, reconstruction and identification. To ensure stable data taking, the CMS RPC collaboration has performed detector operation, calibration and performance studies. After the end of Run-2, it was started the second LHC long shutdown period (LS2), an important opportunity for maintenance and preparation for the next data taking period (Run-3) and the installation of services in preparation for the Phase-II upgrade. The activities included maintenance of power, gas and online systems. In this presentation, the overall performance of the CMS RPC system during the Run-2 period is summarized as well as all the activities done in preparation for future data taking periods.